Testimonials

  • Testimonial for AWS Robin Rigg 2014

    Advanced Wind Solutions assisted us with our increased service and maintenance requirements in readiness for warranty handover to E.on Renewables at Robin Rigg offshore windfarm. AWS became an integral part of our team over the 10 months they were contracted to us in 2014. Their previous experience and skill set proved to be a valuable resource in this process. AWS offer greater flexibility in their diverse work scopes and  a hands on approach gives them a clear advantage in this type of role. Matthew PatersonMVOW Service Manager Robin Rigg Windfarm
  • Offshore Design Engineering Ltd (ode)

    Robin Rigg Offshore Windfarm Offshore Design Engineering (ode) were the Principal Contractor and Works Management Contractor for construction of the Robin Rigg offshore wind farm. Advanced Wind Solutions (AWS) and ode worked in collaboration to complete a broad range of tasks including; offshore substation mechanical works; foundation remedials using rope access techniques and WTG specific technical and inspection works. Drawing upon prior experience of WTG operations and maintenance/service, AWS were able to open the back door into WTG knowledgebase and know-how. AWS lead from the top. Director of the company Chris Lewis actively engaged in the work carried out, ensuring that all employees are professional and provide the highest standard and quality of works. Whether requiring direct supervision, surveillance or monitoring of sub/contractors, or independent completion inspections, identifying defects and actively resolving them, AWS is the project/developers independent Contractor of choice.Offshore Design Engineering Ltd (ode)
  • E.ON

    Since we began working with Advanced Wind Solutions in Spring 2010 I have been impressed with their safety standards and the way in which they cooperate with the E.ON team to ensure efficient delivery of their work packages. Sally ShentonE.ON Operations Manager
  • 1